The installation itself was originally planned to take 4 weeks and was actually completed in half that time, with no interruption to the existing site operations. The after sales and training were excellent.
The installation itself was originally planned to take 4 weeks and was actually completed in half that time, with no interruption to the existing site operations. The after sales and training were excellent.